Reference Hub3
Research on Multi-Cooperative Combine-Integrated Scheduling Based on Improved NSGA-II Algorithm

Research on Multi-Cooperative Combine-Integrated Scheduling Based on Improved NSGA-II Algorithm

Li Ma, Yidi Wang, Meiqiong Ma, Jiyun Bai
Copyright: © 2021 |Volume: 12 |Issue: 4 |Pages: 21
ISSN: 1947-3192|EISSN: 1947-3206|EISBN13: 9781799861614|DOI: 10.4018/IJAEIS.289430
Cite Article Cite Article

MLA

Ma, Li, et al. "Research on Multi-Cooperative Combine-Integrated Scheduling Based on Improved NSGA-II Algorithm." IJAEIS vol.12, no.4 2021: pp.1-21. http://doi.org/10.4018/IJAEIS.289430

APA

Ma, L., Wang, Y., Ma, M., & Bai, J. (2021). Research on Multi-Cooperative Combine-Integrated Scheduling Based on Improved NSGA-II Algorithm. International Journal of Agricultural and Environmental Information Systems (IJAEIS), 12(4), 1-21. http://doi.org/10.4018/IJAEIS.289430

Chicago

Ma, Li, et al. "Research on Multi-Cooperative Combine-Integrated Scheduling Based on Improved NSGA-II Algorithm," International Journal of Agricultural and Environmental Information Systems (IJAEIS) 12, no.4: 1-21. http://doi.org/10.4018/IJAEIS.289430

Export Reference

Mendeley
Favorite Full-Issue Download

Abstract

To promote the integration and optimal allocation of agricultural machinery resources to achieve the purpose of reducing cost and increasing efficiency, the scheduling problem of agricultural machinery in agricultural machinery cooperatives based on the trans-regional operation mode was studied in this paper, Considering multiple agricultural machinery points, multiple types, operation time windows, space distance and other factors, the multi-objective programming mathematical model with the lowest total cost of deployment, the highest service punctuality and the least use of harvester was established by applying path optimization and theory of job shop scheduling. NSGA-II was used to solve the model in this paper. According to the model features, this paper designed chromosome coding and the process of emergence, crossover and variation of initial population. Combined with the actual situation of rice harvesting in Wuchang City, the above scheduling theory was applied. The experimental results showed the validity and feasibility of the scheduling model and the algorithm.